Sindh Hari Alert 2025: Final Deadline Announced for Solar Panel Scheme Applications

The Sindh government has officially announced the final date for applications under the Sindh Solar Panel Scheme 2025, part of the broader Benazir Hari Card initiative. This program is designed to help farmers in Sindh reduce electricity costs, improve irrigation systems, and move toward clean, renewable energy. With the deadline fast approaching, farmers are urged to submit their applications before it’s too late.

A Step Toward Energy Independence

For years, farmers across Sindh have faced rising electricity costs, unreliable power supply, and increasing expenses in running water pumps and agricultural machinery. The new solar panel scheme aims to change that. By shifting to solar power, farmers can enjoy free, sustainable energy while protecting themselves from the impact of frequent load-shedding and fuel price hikes.

Under this program, solar panels will be installed at subsidized rates, allowing farmers to run their tube wells and other equipment efficiently. The government hopes this shift will not only lower production costs but also support the province’s long-term environmental goals.

What Is the Benazir Hari Card?

The Benazir Hari Card is a welfare initiative launched to uplift Sindh’s agricultural community. Through this card, farmers can access financial aid, training programs, and exclusive subsidies for projects such as the solar panel scheme.

Key benefits include:

  • Direct financial support and subsidies for small and medium farmers.

  • Training programs for modern and sustainable farming.

  • Access to low-cost solar energy solutions for irrigation and farm operations.

  • Priority inclusion in future agricultural development projects.

So far, thousands of farmers have registered, and the government has already begun issuing the Benazir Hari Cards to eligible applicants.

How the Solar Panel Scheme Works

One of the most attractive features of the program is its 80/20 funding model. This means:

Contribution Percentage Paid By
Farmer’s Share 20% Farmer
Government’s Share 80% Sindh Government Subsidy

Farmers only need to pay a small fraction of the total cost, making solar power accessible even for those with limited financial means.

Final Date for Applications

The last date to apply for the Sindh Solar Panel Scheme is September 20, 2025. Applications submitted after this date will not be accepted, so interested farmers must act quickly.

Applications can be submitted at:

  • Director General (DG) Agriculture Office, Hyderabad

  • Or through designated district agriculture offices across Sindh

Application Process

To apply for the solar panel scheme, follow these steps:

  1. Visit your nearest agriculture office or the DG Agriculture Office in Hyderabad.

  2. Collect and fill out the Solar Panel Scheme 2025 application form.

  3. Attach the required documents:

    • Copy of CNIC

    • Benazir Hari Card (if already issued)

    • Land ownership or tenancy papers

    • Two passport-size photos

  4. Submit the form before the September 20 deadline.

  5. Wait for the verification process. Selected farmers will be contacted by the relevant department.

Why This Scheme Matters

According to Sindh Agriculture Minister Muhammad Bakhsh Mehar, this program is more than just financial aid—it represents a modern transformation of Sindh’s farming sector. By helping farmers become self-reliant through renewable energy, the province aims to increase agricultural output while protecting the environment.

He emphasized, “Our goal is to empower farmers, reduce their dependence on expensive electricity, and promote sustainable farming practices across Sindh.”

Why You Shouldn’t Miss the Deadline

  • Huge subsidy: 80% of the total cost is covered by the government.

  • Limited slots: Priority will be given to early applicants.

  • Energy savings: Drastically lower electricity bills and maintenance costs.

  • Future-ready farming: Solar energy ensures reliable power and long-term independence.

Final Thoughts

The Sindh Hari Alert 2025 marks a major opportunity for farmers to switch to solar energy and cut down their production costs. With the September 20, 2025 deadline fast approaching, farmers are encouraged to apply as soon as possible to take advantage of this once-in-a-generation subsidy.

Through the Benazir Hari Card and the Sindh Solar Panel Scheme, the provincial government is paving the way for a brighter, greener, and more self-reliant agricultural future in Sindh.

Leave a Comment